Reliable Connectivity for Wind Farming Operations
Renewable Energy Company Remotely Monitors Wind FarmsThey’ve assisted governments, electric utilities, and investors with the design and construction of wind farms that are successfully and sympathetically integrated into the environment while providing a financially attractive source of renewable and sustainable energy production.
As of today, they’ve built over 1100 megawatts of wind plant energy capacity across the United States with over 800 wind turbines, including one of the world’s largest mobilization wind farms.
The Challenge
Finding A Reliable Wireless Connection for Remote Management
Every wind farm project has a research phase in which data is collected at potential wind farm sites to assess their suitability for wind production. Once a site is identified for evaluation, the company sends a team of wind data specialists to collect environmental information such as wind speed, wind direction, and temperature. The wind data is used to calculate the potential usable energy that can be generated by harnessing this natural energy source at the location.
Data is collected by erecting 200-foot meteorological towers on the proposed site. Traditionally, contracted field technicians retrieve and switch the data collection cards from each of the towers every month. The field technicians would then mail the data card to the wind data specialists back at the company’s regional offices, where the data would be downloaded and analyzed. Since many of the sites are located in remote areas, sending technicians to the field every month was both a time-consuming and costly process.
In addition, there was a substantial delay between information gathering on-site and analysis back at the regional offices. Due to these delays, the organization would be unaware of any on-site equipment malfunctions or technical issues until after data cards had been analyzed, which created an unacceptable lag in technical response time to repair and maintain the wind monitoring equipment.
The company had previously tried an analog modem solution connected by wire-line service and powered by a solar battery. This proved to be too high in energy consumption, and the wire-line coverage was not broad enough to cover the desired geographic areas. They needed to find a reliable wireless solution to remotely manage the wind monitoring equipment and provide real-time, two-way communication for data collection and analysis.
The Solution
AirLink RV50X Gateways and Long Range LPDA Antennas
In addition to recommending the RV50X modem, the USAT team provided turn-key integration and consulting services, including wireless RF propagation analysis to select the best wireless operator for each location and provisioning each modem with static IP addresses for always-on connectivity.
To ensure reliable long range connectivity USAT recommended devices from their top antenna manufacturing partners like Poynting, ultimately helping them select the LPDA-92 to ensure maximum signal strength and reliability (even when their sites were located 25 miles away from the nearest local cell tower). And for locations that lacked access to reliable power sources, our team was able to engineer customized NEMA enclosures with photovoltaic solar arrays to supplement their power needs.
The Results
Simplified Remote Monitoring and Immediate ROI
- Simplified remote monitoring solution: The company completely automated the collection and retrieval of critical data from its sites.
- Improved communications: The company now has persistent, real-time two-way connectivity and communications between its remote wind farm equipment and its regional offices.
- Improved operations: Any technical issues with the wind monitoring equipment can be identified and relayed immediately.
- Decreased operational expenses: The wireless solution has eliminated the need for the field technicians to travel on-site to retrieve the data cards.
- Better strategic planning: The organization now has more power and control to effectively analyze wind farm sites, enabling this company and their clients to make better business and financial decisions.
- Immediate ROI: The business reports that they recovered the cost of the modems within six months from initial deployment.
The Team
Device Provisioning, Activation and Installation Services
The Download
Save Solution for Later or Share It With Colleagues
If you'd like to reflect back on this rural networking solution or share it with colleagues, we've included a simple download of this article in a PDF format. Just click below to view it as a PDF and then click save.
Contact Us
Contact USAT to Engineer Your Wind Farm Monitoring Solutions Today
Click an image below to give us a call, send us an email, fill out a contact form, or make a purchase directly on our website.
Recommended Devices for 5G Network Management
Click an Image Below to Start Shopping Online
Additional Reading
Check Out Other Recent Articles, Use Cases, and Case Studies
Share this Post